Custom sheds, built on site in Mobile, AL

Backyard storage sheds built from the slab up, anchored down and finished the way you want them. Most 10×12 sheds are done in 2 to 3 days.

Tan storage shed with white trim, double doors and a metal roof, on a new lawn inside a wood fence
A finished shed in Semmes.

Built where it stands

A shed from a dealer lot is built in a factory and trucked to your house in one piece. That works when there’s a clear, level path to the spot. In a lot of Mobile backyards there isn’t: a narrow gate, a fence, trees or a slope stand in the way.

We carry the materials in and build the shed in place, so it fits where a delivery truck can’t reach. This lean-to went up against the side of a house in a narrow side yard, then was painted to match the siding.

Every shed is custom-built. You pick the size, siding, paint color, roof and doors, and we build it to fit the spot.

Lean-to shed painted teal with white trim, built against the side of a matching teal house

What every shed gets

  • A level baseUsually a concrete slab. Blocks or a wood base where they suit the ground better.
  • Anchored downEvery shed is anchored. On a slab, J-bolts set in the concrete hold the walls down.
  • A metal roofDecked, wrapped in synthetic underlayment and finished in metal with a ridge cap.
  • Your choice of finishSize, siding, paint color, roof and doors, built to order.

How a shed goes up

Most 10×12 sheds take 2 to 3 days. Bigger sheds can take a little longer.

Day 1
We call 811, level the spot and pour the slab, with J-bolts set in the concrete.
Day 2
The walls are framed, bolted down to the slab and sheathed, with the roof framing set on top.
Day 3
The roof, siding, trim and doors go on.
After
Scraps hauled off, then sod, beds or a path to the door if you want them.
Shed walls framed on a new concrete slab, with a ladder and lumber beside it

One shed, start to finish

Shed roof decked in OSB with synthetic underlayment going on
Roof decked and wrapped
Metal roof panels and ridge cap on a new shed
Metal roof and ridge cap
Inside a new shed: framed walls, OSB sheathing and roof framing
Inside, framed and dry
Finished tan shed with white trim, double doors and a metal roof
Finished, Semmes

Already bought a shed?

If your shed is coming from a dealer, the delivery crew needs a level spot to set it on. Most yards aren’t level, and a shed set on soft or sloped ground racks over time: the doors stop closing and water sits under the floor.

We prep the spot before the delivery: clear it, grade it and build a level base, whether that’s a concrete slab, blocks or a wood base. Once the shed is set, we lay sod back up to the edges.

On the Semmes shed job we also poured new concrete and laid fresh sod around it.

New concrete beside a wood gate with fresh sod laid up to its edge

On every shed job

Big or small, these happen every time.

  • Insured$1M general liability coverage.
  • 811 before every digBuried lines marked first, even if it moves the start date.
  • A written contractSigned before any work starts.
  • Mats under machinesGround mats keep equipment from tearing up the grass.
  • Materials on tarpsSoil, rock and mulch stay off your lawn and driveway.
  • Cleanup before we leaveThe yard is cleaned up at the end of the job.

Sheds across Mobile and Baldwin County

Superior Scapes is based in west Mobile and does custom sheds across Mobile County and Baldwin County, including Mobile, West Mobile, Grand Bay and Daphne. See every town we cover.

If the spot holds water after a storm, we’ll look at a French drain or regrade before the shed goes in.

Questions we get

A basic shed off a dealer lot often costs less up front. A shed built on site is sized to fit the spot exactly, finished the way you want and can go where a delivery truck can’t reach. We’ll price it on the estimate so you can compare.

It depends on the size, the siding and roof, and how much work the ground needs first. We don’t list prices because every yard is different. The estimate is free, and the price is in writing before any work starts.

Most 10×12 sheds take 2 to 3 days. The slab is poured on day one, the shed is framed on day two and finished on day three. Bigger sheds can take longer.

Yes, every shed. On a concrete slab, J-bolts are set in the concrete when it’s poured and the walls are bolted down to them.

Usually only for bigger sheds. In our experience, sheds over about 12×12 need a building permit, but the rules differ inside the city and in the county, and setbacks from the property line apply to every shed. Check with the City of Mobile or Mobile County permitting office. Under our contract the homeowner gets any permit the job needs, and we build to it.

Yes. Every shed is custom-built. You pick the size, siding, paint color, roof and doors, and we price it on the estimate.

For the Gulf Coast heat and rain we build with framed lumber, OSB sheathing, painted panel siding and a metal roof over synthetic underlayment, on a concrete slab. A metal roof sheds heavy rain fast and needs little upkeep.

Yes. Grading, sod, beds and paver walkways are what we do every day, so the yard around the shed gets finished on the same job.

Yes. Every job comes with a workmanship warranty, and the terms are written into your contract.